• Client: James Taylor Construction
  • Location: Kilburn, North London
  • Duration: 2 weeks
  • Value: £6,000

As one of the 100 plus substations that we work on each year, this project involved the installation of deep driven earth rods, connections to reinforcing and the installation of a ‘Marshalling Earth Bar’ around the substation walls.

We use a selection of methods to provide a low resistance earth, including earth rods, mats or plates, soil conditioning agents, deep drilled bore-holes – the selection will depend on the particular requirements for the substation and the soil resistivity of the ground.

_MG_8178 (1)PENTAX DIGITAL CAMERAtesting_IMG_1573

A Lightning Protection System is also provided to the building to ensure that all possible measures are in hand.