• Client: Rail Link Engineering
  • Location: Stratford, London
  • Duration: 90 weeks
  • Value: £400,000

Our works included earthing installations for the main maintenance shed for the Eurostar rolling stock where thousands of metres of copper conductor were required for each of the 8 maintenance tracks that are contained within this immense building.

Earthing installations were also carried out for all substations on the site, as well as Lightning Protection Systems for all buildings.