The Waldorf, Aldwych
We're delighted to be back working at this iconic hotel.
As part of a phased refurbishment on this Grade 2 Listed Building, going back to 2005, Cuttings are being brought back to continue with the upgrade of the Lightning Protection System - this stage is the glorious front elevation.